First page Back Continue Last page Graphics
The Construction Process
Dike off sections of shoreline before exposure
Drain and desalinate water within dikes
Build seismically safe inner dikes on dry land
Explore for geothermal, reserve productive wells
Fill ponds behind inner dikes with brine
Flood ponds behind outer dikes for habitat
Repeat as Sea recedes, move habitat ponds out
Former habitat ponds convert to solar ponds